World-leading Vessels :: We have eight vessels strategically placed in different ports around the world, able to respond to any and every need our customers have.

Panzer Burial Sled

 

The burial sled 'Panzer' has been designed with the purpose of burying cables with (or without) steel articulated pipes protection. The standard burial is 2 metres but this can be increased to 3 metres and 5 metres with additional tooling. Since articulated pipe normally covers only the inshore portion of a shore end cable, the sled design parameters included the ability to make a transition from articulated pipe to cable without intervention.

Key Features

  • The entire burial sled comprises of 2 pontoons, a transverse frame (aft) and stinger injector. A subsea hydraulic cylinder that is in turn driven by a 4KW electric hydraulic power unit that activates the 'stinger' mounted injector.